Billy Bishop Toronto City Airport buses roll toward zero emissions as PowerON completes charging installation

May 19, 2024

PowerON commissioned artwork by Indigenous student artist Roma Maré for the main terminal electric bus charger at Billy Bishop Toronto City Airport. The artwork recognizes the infrastructure’s location on the traditional territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples, in a city that is now home to many diverse First Nations, Inuit and Métis people. (CNW Group/Ontario Power Generation Inc.)
PowerON Energy Solutions has completed installation of the infrastructure to charge new electric shuttle buses operated by Nieuport Aviation to connect Billy Bishop Toronto City Airport (Billy Bishop Airport) passengers, employees, and community members from Union Station to the downtown airport.

Today’s announcement is the latest in a series of initiatives to reduce carbon emissions associated with accessing the airport.

Ontario Power Generation (OPG) subsidiary PowerON was selected to install the necessary charging infrastructure to green the airport’s shuttle operation. This project, including chargers at the main pavilion where the airport’s complimentary shuttle bus picks up and drops off passengers, as well as on the island where the airport terminal is located, is now complete, ahead of time and under budget.

PowerON has installed chargers for shuttle buses transporting people to and from Billy Bishop Airport. (CNW Group/Ontario Power Generation Inc.)
PowerON has installed chargers for shuttle buses transporting people to and from Billy Bishop Airport. (CNW Group/Ontario Power Generation Inc.)

Billy Bishop Toronto City Airport terminal owner/operator, Nieuport Aviation, along with shuttle bus service provider TOK Group, have ordered six Vicinity Lightning electric buses, expected to take to Toronto’s streets in 2024.

Quick facts

  • As part of the support offered under the deal, PowerON led a successful funding application on behalf of the client, to assist with costs.
  • PowerON Energy Solutions works with fleet operators and municipalities, including the Toronto Transit Commission (TTC) and Oakville Transit. PowerON and the TTC have a 20-year agreement to help decarbonize the city’s bus fleet.
  • The new electric shuttle buses are estimated to reduce carbon emissions by 2,100 tonnes per year.
  • Environmental sustainability is a priority for the airport. With other environmentally friendly airport access options such as the fully electric Marilyn Bell ferry and the 185-metre pedestrian tunnel, Billy Bishop Airport is one of very few airports in the world that is fully walkable or bikeable.
  • In fact, 41 per cent of Billy Bishop Airport passengers choose to walk, bike, or take the complimentary shuttle bus or public transit from the airport.

Quotes

“It’s not just families that are making the switch to electric vehicles; transit operators, municipalities and airports – like Billy Bishop Toronto City Airport – are making the switch to electric buses to get people where they need to go,” said Todd Smith, Ontario’s Minister of Energy. “I’m so pleased to see PowerON, a subsidiary of Ontario Power Generation, deliver the fast-charging infrastructure that will power these new buses with reliable and affordable energy from our province’s world-class clean electricity grid.”

 Todd Smith, Ontario’s Minister of Energy

“With the introduction of our electric shuttle buses, Nieuport Aviation, in collaboration with PortsToronto, is living our promise of operating a cleaner, greener and quieter Billy Bishop Toronto City Airport,”

Jennifer Quinn, Chief Strategy and Development Officer, Nieuport Aviation

“Ontario’s clean electricity system has the power to electrify higher emitting sectors like transportation, and our work on the Billy Bishop Airport shuttles is a great example of that,” said Keegan Tully, PowerON Energy Solutions Managing Director. “We worked closely with the client to ensure the necessary infrastructure is in place and tested ahead of time, enabling a smooth roll-out when the buses arrive.”

 Keegan Tully, PowerON Energy Solutions Managing Director

“We are thrilled to join our partners Nieuport Aviation in welcoming PowerON’s charging infrastructure to Billy Bishop Airport,” said Warren Askew, Vice President, Airport at PortsToronto. “This announcement builds on a strong foundation of sustainable innovation at Billy Bishop Airport, which includes Canada’s first zero-emission ferry. Clean, electric infrastructure like this benefits our passengers, staff, community and those who live, work and play on Toronto’s remarkable waterfront – congratulations to all who helped bring this project to life.”

Warren Askew, Vice President, Airport at PortsToronto

More information available here


Daily News

  • EV Industry Leaders’ Letter to Prime Minister Carney

    EV Industry Leaders’ Letter to Prime Minister Carney

    Dear Prime Minister: As executives from businesses operating in Canada’s electric vehicle (EV) industry, including charging solutions and deployment, vehicle manufacturers, charging installation and maintenance, and e-mobility technology solution providers, we write to you about Canada’s EV ambition. Together, we are building the backbone of Canada’s EV transportation economy. Read More…

  • No Apps, Just Taps: The Smarter Way to Collect Charging Revenue

    No Apps, Just Taps: The Smarter Way to Collect Charging Revenue

    No Apps, Just Taps. In 2025, drivers expect charging to be as simple as tapping a card or mobile wallet. With Electric Avenue, site hosts get flexible, future-ready payment options that make revenue collection seamless, and drivers get the frictionless charging experience they demand. Electric Avenue chargers, powered by Nayax payment technology, support both built-in and external… Read More…


Product News

  • GB Agencies: ChargePoint 6000 Series Level 2 AC Charger

    GB Agencies: ChargePoint 6000 Series Level 2 AC Charger

    Prepare for whatever the future of EV charging brings with the ChargePoint CP6000. This 80A networked electric vehicle (EV) charging station offers high-output, reliable charging for your employees, customers, residents or fleets – and can charge any EV, regardless of connector type. Single configurations can range between 16A and 80A and dual configurations can support both… Read More…

  • GB Agencies: Power Outlet Box POB – RVEV

    GB Agencies: Power Outlet Box POB – RVEV

    The power outlet box features a selection of NEMA receptacles, designed for reliable, continuous 30A or 50A draw suited for charging electric vehicles, recreational vehicles and other high-power appliances. Its durable construction ensures safe and efficient performance for outdoor applications, making it an essential addition for any EV-ready home or facility with a plug in EV charger, Recreational Vehicle or power appliances. The… Read More…