Black Box: Dual Energy Manager for Service Sizes 125A – 200A, and up to TWO End Devices

Black Box: Dual Energy Manager for Service Sizes 125A – 200A, and up to TWO End Devices

May 21, 2025

Black Box’s patented automatic load management system or EV energy management system (EVEMS / EMS) provides the ability to install up to two 11.5KW or 48A electric vehicle* chargers on an existing electrical service that would otherwise cause overloading issues. No need for an electrical panel or service upgrade. Compatible with all major EV manufacturers and charge rates.

This dual-energy manager is for service size 125A -200A and can control 2 end devices*, with one being priority and the other secondary, on 1 electrical service. 

*See settings chart below or in the installation manual for setting options.

Dual Energy Manager Key Features

  • Can manage up to 2 end devices on 1 electrical service
  • Fast and easy to install: 30-45 min.
  • Small size fits in tight areas around electrical panels (8″ x 8″ x 4″).
  • Approved for general use or as an EVEMS by Intertek (ETL)
  • Longest charge times due to intelligent current monitoring.
  • No need to disconnect the main service wires.
  • No extra breakers needed.
  • Solar grid tie installation compatible.
  • Real-time reading of the total power consumption of the electrical panel.
  • Bi-Directional capability
  • Remote shutdown override equipped

These can be used to control up to 2 general-purpose devices that can tolerate load shedding, up to a max of 40FLA/50A per contactor. When using with general-purpose devices select the settings row with the rating just above what the device rating is.

Link to installation instructions and specifications sheets for more information.

Source


Daily News

  • BC Hydro adds Two EV Fast-Charging Hubs in Port Moody, Surpassing 600 Ports in its Network

    BC Hydro adds Two EV Fast-Charging Hubs in Port Moody, Surpassing 600 Ports in its Network

    BC Hydro has recently opened two new fast-charging hubs in Port Moody with 21 new charging ports for electric vehicles (EVs). This latest expansion marks another milestone in BC Hydro’s network, with more than 600 ports now in operation provincewide. “These new fast-charging hubs in Port Moody further our collaboration with BC Hydro and other partners to expand… Read More…

  • BC Hydro Opens 22 New EV Charging Ports in Whistler

    BC Hydro Opens 22 New EV Charging Ports in Whistler

    BC Hydro has opened a new electric vehicle (EV) charging hub in Whistler with 22 new charging ports, making it the largest charge site currently within BC Hydro’s network. “This new electric vehicle charge hub in Whistler continues our work with BC Hydro and other partners to make cleaner options more accessible and affordable for… Read More…


Product News

  • Mersen: Expanded Ratings in Class RK1 Reducer Fuse Series

    Mersen: Expanded Ratings in Class RK1 Reducer Fuse Series

    Mersen is pleased to announce the expansion of the 600V ratings to its first-to-market Class RK1 Reducer Fuse product series. The newly released 600V ratings provide a permanent and reliable solution and are designed to be used in all applications where standard UL Class RK-1, RK-5, K-5, and H fuses are typically employed. Certified as… Read More…

  • United Chargers Launches Grizzl-E Club EV Charger-as-a-Service Subscription Model

    United Chargers Launches Grizzl-E Club EV Charger-as-a-Service Subscription Model

    July 4, 2025 United Chargers Inc., known for the Grizzl-E line of EV chargers, announces Grizzl-E Club, a first-of-its-kind charger as a service that provides a free EV Charger and pays drivers back for charging. Grizzl-E Club is designed to make EV ownership more rewarding, accessible, and future-ready. Beginning July 1st, Canadians can join this Grizzl-E… Read More…