The Electric Circuit Introduces New Fast-Charge Stations with Power Sharing

August 31, 2023

The Electric Circuit is introducing new fast-charging stations with dynamic power sharing and making them available for the first time in Canada in the city of Rivière-du-Loup.

The new Satellites based charging stations are manufactured by Kempower of Finland and distributed in Québec by Bornes Québec. Three dual charging outlets share a total of 500 kW of power that is dynamically distributed among connected vehicles based on their respective charging capacities. Each charging cable can deliver up to 300 kW of power.

“These new stations are a welcomed addition to the Electric Circuit, since they’ll simplify the charging experience for our members and maximize the charging power. Our goal remains the same: to make the charging experience as simple and efficient as possible for EV drivers in Québec,”

France Lampron,
head of the Electric Circuit

“The Kempower charging stations are already proven to work in Finnish winter conditions. The tried-and-tested technology is perfectly adapted to our climate and the diversity of electric vehicles on Québec’s roads,”

Guy Lamarche,
General Manager of Bornes Québec

Dynamic power sharing simplifies the charging experience by allocating the maximum power available to each user based on the vehicle’s capacity.

Charging rates

Users won’t have to select the power level, which will be set automatically by the charging station and billed based on the vehicle’s capacity. The rates at these fast-charge stations are determined in the same way as those that apply at the other fast-charging stations in the Electric Circuit: per-second billing based on power tiers.

An Innovative Configuration

The configuration of the dual charging stations and cable management system also facilitates charging for all types of EVs. Vehicles hauling trailers and even travel trailers will be able to easily drive in and out, just like they do at gas stations. 

The first of these new charging stations will be installed at 80 Boulevard Cartier in Rivière-du-Loup, where St-Hubert restaurant has graciously given up part of its lot to make room for the charging point. St-Hubert is a founding member of the Electric Circuit.

Source

Related Article

The Electric Circuit Inaugurates its Largest Fast-Charging Point at La Porte de l’Érable Rest Area on Highway 20

The Electric Circuit is pleased to announce the commissioning of its largest fast-charging point at the La Porte de l’Érable rest area located at Exit 228 on Highway 20.


Daily News

  • Leviton Reduces Greenhouse Gas Emissions by 45% Since 2021

    June 29, 2026 The company’s 2025 Sustainability Report highlights continued progress toward its goal to be carbon neutral by 2030 On June 22, 2026, Leviton announced in its 2025 Sustainability Report that the company reduced greenhouse gas (GHG) emissions by 45% since 2021, a significant milestone as Leviton celebrates 120 years of innovation. Driven by its CN2030… Read More…

  • LEDVANCE Appoints Eric Liu as CEO, LEDVANCE Canada

    June 29, 2026 LEDVANCE Appoints Eric Liu as CEO, LEDVANCE Canada LEDVANCE announced that Eric Liu has been named CEO, LEDVANCE Canada. In this role, Liu will lead the Canadian business, with a focus on strengthening customer partnerships, accelerating business growth, and improving go-to-market execution across Canada. A global business leader with extensive experience, Liu… Read More…


Product News

  • Discover Mersen’s New Generation of 1,000 VDC Fuse Solutions for Electric Vehicles

    June 29, 2026 Mersen has enhanced its 1,000 VDC fuse platform for electric vehicle applications, delivering improved technical performance while helping reduce the total cost of ownership. Designed to meet the evolving demands of modern e-mobility systems, the new generation of EV fuses provides advanced circuit protection, increased reliability, and optimized system efficiency. Driving ahead… Read More…

  • Express DC Charger from EATON: One System – Infinite Possibilities

    June 29, 2026 The next generation of the ChargePoint Express architecture delivers high-power, scalable EV charging across standalone, distributed and paired deployments. Designed to maximise throughput and minimise cost, it helps commercial operators grow revenue and enables fleets to lower deployment and operating costs. One system – infinite possibilities Eaton and ChargePoint fully reimagined future-ready… Read More…