BC Hydro Adding Higher-Powered Fast Chargers to its Network

November 10, 2023

At Fully Charged LIVE Canada, BC Hydro announced it is adding higher-powered chargers to its fast-charging network with the introduction of 180-kilowatt charging units, which can add up to 180 kilometres of driving to an average electric vehicle in about 10 minutes.

“B.C. is a leader in electric vehicle adoption and has one of the largest public electric vehicle charging networks in Canada, and we are committed to providing more options for drivers looking to charge their vehicles, especially if they are short on time,” says Hon. Josie Osborne, Minister of Energy, Mines and Low Carbon Innovation. “These new higher-powered chargers have the ability to charge electric vehicles in a fraction of the time.”

Hon. Josie Osborne,
Minister of Energy, Mines and Low Carbon Innovation

In addition to being faster, the units also offer dual charging or power sharing, which allows two customers to use the same charger. For example, a 180-kilowatt charger can adjust to provide two 90-kilowatt charging units and allow more drivers to access public charging stations.

BC Hydro Adding Higher-Powered Fast Chargers to its Network
A new 180 kW EV charging station on display at Fully Charged LIVE Canada in Vancouver

The adoption of electric vehicles across British Columbia has increased significantly. There are now more than 120,000 EVs on the road in B.C., and BC Hydro predicts there will be between 700,000 and 900,000 EVs within the next 10 years.

“Our recent research found that of the 40 per cent of British Columbians looking to purchase a new vehicle in the next three years, many are considering an electric vehicle,” says Chris O’Riley, President and CEO of BC Hydro. “We are listening to the feedback from our customers who tell us they are looking for more charging options and higher-powered chargers to join our fast charging network, and we are excited to begin the installation of these 180-kilowatt units later this fall.”

Chris O’Riley,
President and CEO of BC Hydro

The first communities expected to receive these units include Tumbler Ridge, Manning Park, Mackenzie and Surrey. BC Hydro aims to start installing these units in late fall 2023 and many of its new locations planned in 2024 will also receive these higher-powered charging units.

BC Hydro’s provincewide fast charging network currently includes 153 charging units at 84 sites in communities throughout B.C. BC Hydro is looking to add 3,000 ports to its network over the next 10 years. The chargers are funded in a partnership with the Province of B.C. and Natural Resources Canada.

Source


Daily News

  • Hammond Power Solutions Appoints Aaron Karr as Regional Sales Manager

    Hammond Power Solutions Appoints Aaron Karr as Regional Sales Manager

    April 24, 2026 Hammond Power Solutions (HPS), a leader in dry-type transformers and power quality solutions, is pleased to announce the appointment of Aaron Karr as Regional Sales Manager for Southwestern Ontario. In this role, Aaron will support customers and distributor partners across the region, with a focus on driving growth, providing education, and advancing Read More…

  • Canada and United States of America to Co-Host Global Vehicle Safety Conference in Toronto

    April 22, 2026 28th International Technical Conference on the Enhanced Safety of Vehicles (ESV) to showcase next-generation safety innovation Canada and the United States are bringing the global road safety community together in Toronto this May to accelerate innovation and strengthen international collaboration aimed at reducing fatalities and serious injuries on our roads. Co-hosted by Transport Read More…


Product News

  • Leviton Introduces the VerifEye® Series 2500 Submeter: A Scalable, Field-Programmable Energy Monitoring Solution

    April 14, 2026 New submeter streamlines product selection and installation  Leviton has announced the launch of the VerifEye® Series 2500 Submeter, a versatile energy monitoring solution engineered to support single-, two- and three-phase applications with a single model. The Series 2500 streamlines product selection, installation, commissioning and long-term performance. Designed for installers, the submeter includes a Read More…

  • Eaton Unveils Brightlayer Energy

    April 14, 2026 Eaton unveils Brightlayer Energy, an AI-powered energy management and optimization software to drive new levels of efficiency and flexibility for healthcare, education, retail and other building environments Intelligent power management company Eaton has announced the availability of Brightlayer Energy, an AI-powered energy management and optimization system (EMOS). It is designed to help Read More…