Champion Duct™ Fiberglass Repair Kit

April 8, 2026

Champion Duct™ Fiberglass Repair Kit

The Champion Duct Fiberglass Repair Kit includes a strong fiberglass knitted tape, pre-coated with fast setting water-activated urethane resin.

Product Overview

The Champion Duct Fiberglass Repair Kit is a water-activated, fast curing, in-field fiberglass conduit repair system, ideal for cracks, breaks, reinforcing joints, providing corrosion resistance, and rebuilding conduit wall strength – in virtually any situation.

Champion Duct Fiberglass Repair Kit Advantages

The Duct Fiberglass Repair Kit is Used By:
  • Petrochemical
  • Industrial processing
  • Pulp and paper
  • Military
  • Marine
  • Irrigation Power generation
  • Facilities maintenance
  • Water/wastewater
  • Manufacturing Food processing
  • Pharmaceutical
  • Automotive
The Champion Duct Fiberglass Repair Kit is Used for:
  • Routine and Emergency Conduit and Bridge Drain Repairs
  • Structural Reinforcement
  • Sealing Joints Rebuilding Conduit side Walls
  • Corrosion Protection
  • Abrasion Protection
  • Repairs in Hard to Reach Areas
Champion Repair Kit Contents:
  • Gloves for easy clean-up
  • Detailed instructions
  • Knitted fiberglass tape with water-activated, fast setting polyurethane resin

Data Sheets

Champion Duct™ Fiberglass Repair Kit

Description

Each kit contains a roll of knitted fiberglass tape precoated with water activated polyurethane resin enclosed in a sealed foil pouch, latex gloves and printed instructions.

Source

More Information

Ready to learn more? Contact Champion Fiberglass today.

Related Product

Now Available: XUR – Expandable Utility Risers from Champion Fiberglass

Champion’s new XUR solution is an expandable riser requiring no cutting or gluing, easing the installation of ground electrical cable to panel and meter boxes. Like other Champion Fiberglass® products, Champion XUR is lightweight, corrosion-resistant, and offers a low coefficient of friction during installation.



Daily News

  • Building a Stronger Maritime Electricity Grid

    July 27, 2026 With electricity demand expected to double by 2050, the challenges our grid faces in 2026 have outgrown province-by-province approaches, and the costs of fragmentation are rising. That is why the Government of Canada is working with provinces and territories to build a stronger, more interconnected electricity system that supports affordability, reliability, security… Read More…

  • Tripling B.C.’s Public Charging Network by 2035

    July 27, 2026 Provincewide expansion will deliver faster, more convenient charging for EV drivers in B.C. Summary Together with BC Hydro, the Province is expanding British Columbia’s public charging network, more than tripling the number of charging ports in the province. “As conflicts overseas increase pain at the pumps here at home, more British Columbians… Read More…


Product News