E.B. Horsman: Siemens EV Charger Make-Ready App for EV Infrastructure Planning

February 19, 2025

Siemens offers a comprehensive suite of solutions to support electric vehicle (EV) owners and operators. Beyond their advanced EV chargers, Siemens provides tools to help users understand and implement the necessary power distribution equipment for various charging applications.

What is the Siemens EV Charger Make-Ready App?

The Siemens EV Charger Make Ready App is a powerful tool designed to guide users through the electrification process of EV charging infrastructure. This app provides step-by-step insights into the power distribution equipment needed for different EV charging installations, making planning easier and more efficient. By using the Siemens EV Charger Make-Ready web application, customers and partners can design a customized EV charging infrastructure and automatically generate a Bill of Materials (BOM) listing the electrical equipment needed for seamless installation and electrification of EV chargers.

Key Features of the Siemens EV Charger Make-Ready Web Application

  • Compatible with Siemens L2 EV Chargers and other EV chargers
  • Power distribution equipment: Switchboards, Panelboards, Safety Switches, and Loadcentres
  • Distribution transformers for reliable power supply
  • EV charger mounting solutions: Mounting posts and VersiCharge XL
  • Comprehensive installation and commissioning support
  • Advanced load management for optimized power distribution

Applications of the EV Charger Make Ready App

  • Residential Charging – Get recommendations on installing chargers using dedicated two-pole circuit breakers in existing home panelboards.
  • Workplace Charging – Learn how to integrate a small number of chargers across multiple buildings with charger management software for monitoring and control.
  •  Parking Lot Solutions – Discover compact, integrated power systems for Level 2 and Level 3 chargers, featuring sequential charging software to optimize utilization.
  • Condominium & Multi-Unit Dwellings – Understand how to integrate charging solutions with Building Automation Systems (BAS) for scalable and cost-effective installations, including revenue-accurate metering and dynamic load management.

Source


Daily News

  • The Federal Government Announces Pause and Review of EV Sales Mandate

    The Federal Government Announces Pause and Review of EV Sales Mandate

    September 12, 2025 As part of Prime Minister, Mark Carney’s recently announced measures to “protect, build, and transform Canadian strategic industries” in response to the impacts of US tariffs, the federal government will not require automakers to meet the 2026 Electric Vehicles Availability Standard (EVAS). Under the EVAS auto manufacturers and importers must meet annual… Read More…

  • PowerCo Launches Recruitment Campaign for Largest EV Battery Plant in Canada

    PowerCo Launches Recruitment Campaign for Largest EV Battery Plant in Canada

    Recently, PowerCo Canada has officially launched its first job recruitment campaign for what will be the country’s largest-ever electric vehicle (EV) battery manufacturing plant, located in St. Thomas, Ontario. The start of recruitment marks a significant milestone for the project, local economy and the community, as PowerCo seeks to fill hundreds of well-paying jobs in… Read More…


Product News